Project Description
TBC Conversions – Far Circular Road, Dungannon
Provision of a 24,000 sq ft workshop for taxi and bus conversions. The workshop was a portal frame structure with low rise block work walls and cladding to walls and roof. The floor was finished with concrete insitu floated floor slab.
All associated site works completed.
Duration 22wks
Project Details
- Client TBC Conversions
- Date June 19, 2014
- Tags Commercial
Comments are closed.