Project Description
Terex Campsie – New manufacturing facility including offices and welfare facilities
- Created new entrance from main road, site clearance and excavations to reduce existing levels. Storm water attenuation and waste water pumping station all carried out by our in house civils team.
- Pre cast driven piles (contractor designed) and in situ pile caps and ground beams.
- Structural steel frame in excess of 16m high with Kingspan cladding to include crane rail for 4 gantry cranes
- Contractor designed reinforced concrete flooring and yard works. Which included geogrid and geotextile reinforced hardcore base.
- Completed electrical package which included new supply, substation and distribution panels.
- Completed mechanical package which include airlines, fuel lines and oil lines positioned throughout floor.
- Networks linked to existing buildings.
Project Details
- Client Terex
- Date December 13, 2022
- Tags Civil Engineering